News center

Latest news from ABB Australia

News articles

  • ABB introduces its new ProcessMaster flowmeter

    2008-09-18: ProcessMaster is specifically designed to satisfy needs of a diverse range of applications from chemical, power, oil and gas, pulp and paper, and metals and mining industries.

  • Making your robot safer

    2008-09-18: As robots become common place in the modern manufacturing plant, operator safety is becoming more of a priority. Daniel Hall, Editor of Factory Equipment News spoke with ABB's business development manager Greg Sale.

  • ABB awarded $10-million power solution for one of the world’s biggest ammonium nitrate plants

    2008-08-27: ABB solution to provide safe, reliable and secure power to help Australia’s mining industry

  • Meet the new members of the ABB transmitter family

    2008-08-25: The ABB transmitter portfolio is growing thanks to the launch of the 364DD, 364DR/PR and 364AS/GS gauge and absolute pressure transmitters.

  • ABB introduces VA meter with new electronics

    2008-08-25: ABB’s new variable area flow meter with its electronics offers intuitive operation which is readily comparable to modern cell phones. It can easily be configured at the meter site without resorting to any written instructions.

  • ABB Robotics to issue Jogging Licences

    2008-06-18: As industries look to add robot technology to the production cycle, Operator Safety is factored in as part of the complete solution offered by ABB

  • When superior power-to-weight ratio is critical

    2008-06-18: When Sinclair Knight Merz (SKM) went searching for an efficient drive system for the Clermont Coal development - they turned to ABB. Specifically, ABB’s electric slip-ring motors

  • What happens if the power goes out?

    2008-06-18: This question was the central focus of the ABB Technical seminar held in Melbourne on 29 May 2008. The local sales team for MV, LVS and LVP, Motors and Drives had invited EPCs, Consultants and End Customers to a seminar focusing on very topical issues.

  • ABB service ensures maximum availability and efficiency

    2008-05-23: 26 May - As robots assume an ever greater role in automated production processes, it is essential to minimise downtime caused by unexpected malfunctions or failures. Nicole Ebert, ABB Robotics Service Manager explains how ABB’s service agreements can help plant operators extend mean time between failure (MTBF) to ensure maximum robot availability and efficiency.

  • ABB secures $64 million Pluto LNG contract win

    2008-05-20: ABB has been awarded over $64 million worth of contracts to supply equipment for Woodside's $12 billion Pluto Liquefied Natural Gas (LNG) Project, currently under construction in Western Australia.

Press releases

  • Rate this page
     
  • E-mail this page
     
auabb504 952ba957dc233bcfc1256e860006bb5b